Search
  • Kaitlyn Pibernik

Bristol Myers Squibb

Updated: Oct 28

The process tanks at the site were fitted with GRP cover in the early 1990s. The covers were generally in good condition but some of the walk-on panels around the periphery were showing signs of delamination. In addition, the mixer deployment hatches needed to be repositioned to accommodate new mixer equipment. Handrailing was also required to limit personnel access to the walkway areas.


The process tanks at the site were fitted with GRP cover in the early 1990s. The covers were generally in good condition but some of the walk-on panels around the periphery were showing signs of delamination. In addition, the mixer deployment hatches needed to be repositioned to accommodate new mixer equipment. Handrailing was also required to limit personnel access to the walkway areas.


Aeration Tanks 2 no. 19m dia

Annoxic Tank 17m dia

Equalization Tank 15m dia

Picket Fence Thickener 8.8m dia



12 views
  • LinkedIn
  • Twitter Social Icon
  • Facebook Social Icon

CONTACT US:

© 2020 Corporate Engineering Ltd.

GET IN TOUCH:

Tel: 01189701366

Email: sales@grpcovers.com

Corporate Engineering Ltd.

Culham Mill

Little London Road

Silchester

RG7 2PP