Installation of GRP Covers is an important part of our service. Even the installation of a simple cover requires careful planning to ensure a safe and satisfactory outcome. As a responsible supplier, risk reduction during the installation phase is paramount to us during the cover’s design.
All installation activities are covered by project-specific Risk Assessments and Method Statements. These can be supplied in Corporate Engineering’s own format or in a format to suit the customer’s requirements.
All crane operations are covered by a crane plan drawn up by a fully qualified Appointed Person.
Our installation personnel are fully trained and qualified to work on construction sites and operational water and sewage treatment plants.
Our installers’ certification includes:
CSCS Cards- All Personnel
CSCS Gold Card- Installation Supervisors
SSSTS- Site Supervisors
CSCS Cards- All Personnel
PASMA
MEWP
Appointed Person
Slinger Signaler
Lift Supervisor
Working at a height/leading edge