GET IN TOUCH:

Tel: 01189701366

Email: sales@grpcovers.com

Corporate Engineering Ltd.

Culham Mill

Little London Road

Silchester

RG7 2PP

  • LinkedIn Social Icon
  • Twitter Social Icon
  • Facebook Social Icon

© 2019 Corporate Engineering Ltd.

CONTACT US:

Corporate Engineering Ltd.

Corporate Engineering Ltd. was bought in 1995 by Sam McCoy, a manufacturer of water treatment equipment for the industrial, water and wastewater markets. Before this, Corporate Engineering Ltd. was known as Aform. 23 years later, Corporate Engineering Ltd. is still dedicated to providing quality glass reinforced covers for odour management and other bespoke designs. Our team of designers can guarantee you the quality you deserve, and our excellent customer service team can ensure you speak to the right people at the best time. You can email our team at sales@grpcovers.com.

Our Top Projects

deephams

2017-2018

Deephams Sewage Treatment Works is a sewage treatment facility close to Picketts Lock, Edmonton, England. The outflow discharges via Pymmes Brook into the River Lee Navigation at Tottenham Lock.

 

Deephams is one of CEL's biggest jobs, and it represents most of what CEL is capable of. Please look through our gallery, and if you have any queries / would like to enquire, please call us.

meols

2010

The initial contract was to cover the inlet works to contain the odours below from where they could be ducted to a new odour control plant. A major consideration was the regular flooding of the area. The covers would need to not only contain odour but be able to withstand flood water in excess of 2 metres depth.

 

Working with the Client and the consultant, a solution was developed utilising an array of “flood pressure relief hatches” to balance water pressure above and below the covers.

 

As this area was already hand-railed, the covers were considered non-accessible giving a considerable saving over the original plan to remove the rails and have the covers accessible at the higher loading.

 

A solution was developed that gave the operatives a safe means of access to the area with covers designed for an imposed load of 1.5kN/m2 as specified in WIMES 8.05 appendix G - accessible covers.